Tony Grove Dam Spillway and Seismic Mitigation Construction
United States of America > AGRICULTURE, DEPARTMENT OF > FOREST SERVICE > USDA-FS, CSA NORTHWEST 6
Original Solicitation Links
Contact
Submission Instructions
Description
The Forest Service is soliciting a firm-fixed-price construction contractor for the Tony Grove Dam Spillway Capacity and Seismic Mitigation project. Work includes reconstructing portions of the dam; replacing outlet works; raising the dam crest; placing embankment, filter sand, gravel drain, and roadbase materials; installing reinforced-concrete intake, gate-hoist, outlet, pipe-encasement, and water-level-indicator structures; installing 30-inch, 3-inch, and 6-inch HDPE piping, a slide gate, instrumentation, drainage components, articulated concrete-block slope protection, and quality-control facilities. The base work includes clearing, pollution control, surveys, mobilization, dewatering, excavation, earthfill, concrete, piping, instrumentation, field office and laboratory support, and related construction activities. Options include a precast concrete vault restroom and hot-mix asphalt. The contractor must submit a technical proposal addressing approach, project management, schedule, experience, and past performance, along with a complete price quote for all schedule-of-items line items. The acquisition is a total small-business set-aside, with a stated price range of $1,000,000 to $5,000,000 and a mandatory performance period from June 1, 2027, through October 1, 2027, for the base work; option periods are listed through November 1, 2027.
Classification Codes
Smart Codes
Specifications
Timeline
Requirements
- Workers Compensation and Employer's Liability — $100,000.00
- General Liability — $500,000.00
- Automobile Liability — $200,000.00
- Aircraft Public and Passenger Liability — $200,000.00
- Bid Bond — 0%
- Within the last 5 years
- Client point of contact required for each reference
Documents
| Title | Date Posted |
|---|---|
| C04 Attachment 2 - SOI Tony Grove.xlsx | Oct 05, 2026 12:00 PM |
| C04 Attachment 5 - DBA WD UT20260105 Cache Co 051826.pdf | Oct 05, 2026 12:00 PM |
| C04 Attachment 1 - Solicitation Tony Grove.pdf | Oct 05, 2026 12:00 PM |
| C04 Attachment 3 - Specifications Tony Grove.pdf | Oct 05, 2026 12:00 PM |
| C04 Attachment 4 - Drawings Tony Grove.pdf | Oct 05, 2026 12:00 PM |
| C05 Amendment 01 Tony Grove.pdf | Oct 21, 2026 12:00 PM |
| C05 Amendment 02 Tony Grove.pdf | Nov 05, 2026 12:00 PM |
'Other Heavy and Civil Engineering Construction' Opportunities
The City of Fernandina Beach is seeking sealed bids for beach harmonization and improvements at Seas...
Dallas County is seeking a construction manager at risk for the Road and Bridge 4 Project.
Key Construction is accepting bids for the 36N Phase V – The Legacy project at 1384 E. 38th Street N...
Cobb County is seeking a design-build team for a paved pedestrian and bicycle trail along the Chatta...
The Federal Highway Administration is seeking sealed bids for a firm-fixed-price project to replace ...
Manatee County is seeking bids for construction work on the Lake Manatee utility boat ramp and dock.
The Franklin Regional Council of Governments is soliciting construction of a new channel and crossin...
The Minnesota Military Affairs Department posted a construction project, but the project scope and c...
Dodge County, Wisconsin is requesting bids for construction of the Gold Star Memorial Trail associat...
Ottawa County is seeking construction services for Phase I improvements at the Rosy Mound property, ...
Fort Bend County is seeking one contractor to reconstruct Evergreen side roads, including roadway, s...
The Government of The Bahamas is requesting a quotation for a dock at Driggs Hill in South Andros; t...
Imperial Irrigation District is requesting proposals to construct a 2,100-acre-foot off-line reservo...
Lake County, Florida, is seeking a pool of qualified contractors for on-call road, drainage, and sid...
St. Tammany Parish Government is seeking sealed bids for the Cross Gates Subdivision highway, street...
The City of Elk River is seeking a contractor for CR 33 improvements from Highway 169 to County Stat...
Volusia County is seeking offers for Phase 2B of the C2103 Beresford Avenue Extension project, due D...
The City of Calgary is requesting proposals for the Shepard to Bow construction package, a 36-month ...
Defence Construction Canada is inviting contractors to apply for an Open Construction Source List fo...
Defence Construction Canada is inviting contractors to apply for an Open Construction Source List fo...
Defence Construction Canada is inviting contractors to apply for an Open Construction Source List fo...
Defence Construction Canada is inviting contractors and suppliers to apply for an Open Construction ...
Defence Construction Canada is inviting contractors to apply for an Open Construction Source List fo...
Defence Construction Canada is inviting contractors to apply for an Open Construction Source List fo...
Defence Construction Canada is inviting contractors to apply for an Open Construction Source List fo...
Opportunities Near Cache County, Utah
Cache County School District is seeking proposals for network switches, wireless access points, rela...
Cache County School District is seeking proposals for network switches, wireless access points, rela...
North Logan City and Hyde Park City are seeking bids for the Cub River Wetland Mitigation Site Proje...
River Heights City is seeking bids to install a generator and make related improvements at its Lower...
Cache County School District is seeking proposals for wireless access points, network switches, rela...
Smithfield City is seeking bids to install a new 12-inch HDPE waterline and connect existing springs...
The State of Utah Division of Facilities Construction and Management is seeking bids from prequalifi...
The Utah Division of Facilities Construction and Management is seeking design services to renovate B...
Nibley City is seeking sealed bids to construct a regional drain line with multiple sizes of piping,...
Brigham City Public Library is seeking six columns of outdoor hold-pickup lockers compatible with it...
Weber School District is seeking bids for a range of musical instruments, instrument accessories, an...
Weber School District is seeking K-6 mathematics curriculum and learning resources, including math m...
The Box Elder School District is seeking bids for approximately 2000 small boxes of beef, each conta...
The State of Utah Division of State Parks is seeking an operator to manage motorized watercraft rent...
Pleasant View City is seeking a consultant to provide municipal planning and zoning services, includ...
Pleasant View City is seeking a managed IT services provider for comprehensive support of its munici...
Ogden City is seeking a provider to serve its Justice Court with constable services, including warra...
Ogden City is seeking a contractor to provide constable services for its Justice Court, including wa...
The General Services Administration is seeking proposals to lease 2,138 to 2,250 ABOA square feet of...
Ogden City is seeking professional engineering services to investigate, design, bid, and support con...
Ogden City is seeking a civil engineering firm to support federally funded galvanized and potential ...
The Defense Logistics Agency is soliciting offers for circuit card assemblies, with a total estimate...
Ogden City Corporation is seeking a contractor for culinary and secondary water main work, minor sew...
Weber School District is seeking bids for fertilizer and herbicides, with electronic bid submission ...
New Opportunities
The Kansas Supreme Court Office of Judicial Administration is seeking proposals for a cloud-hosted l...
The School Board of Polk County, Florida, is seeking bids for a Group D firewall managed internal br...
Nassau County is seeking bids for priority resurfacing of various roads in Phase 19, with bids due D...
The City of Lévis is seeking professional services to characterize potentially hazardous materials i...
Unified Fire Authority is requesting quotes for banquet services for its annual banquet.
Meridian School District 101 is seeking managed support and maintenance for its existing eligible ne...
The Washington State Department of Transportation is seeking a contractor to relocate buried utiliti...
The Texas Department of Transportation is seeking bids for asphalt pavement repair on various highwa...
The City of Livonia is seeking a contractor to design, typeset, print, and distribute up to three an...
San Juan Unified School District is seeking proposals for multi-year internet access, data transport...
The City of Asheville is seeking a trail builder to repair and reconstruct storm-damaged trails and ...
The Regional Center of Orange County is seeking a provider to develop and deliver crisis-response tr...
Harlem Consolidated School District #122 is seeking an enterprise resource planning software system ...
East Stroudsburg Area School District is seeking network switches, modules, power supplies, licenses...
The New Jersey Water Supply Authority is requesting statements of qualifications and technical propo...
Virginia Polytechnic Institute and State University is seeking suppliers for disposable food service...
The City of Charleston, West Virginia, is seeking annual maintenance for elevators at city-owned fac...
The University of Iowa is seeking suppliers to provide a broad range of perfusion disposables, inclu...
The City of Garland is seeking a contractor to renovate part of the South Garland Library parking lo...
The City of Sealy is seeking a contractor to construct, implement, operate, monitor, and support a d...
KGHM is seeking delivery of parts for a VPA1530 press in Poland.
The City of Wyoming is seeking a contractor for the reconstruction of the watermain on 39th Street.
The Township of West Caldwell is seeking a qualified attorney or law firm to serve as Planning Board...
The Sequoyah Regional Library System is seeking one Cisco Catalyst 9162I wireless access point with ...
Drew Central School District is seeking 12 rack- or tower-mountable 1500VA/1350W uninterruptible pow...
What is Tony Grove Dam Spillway and Seismic Mitigation Construction (gaoa tony grove dam spillway capacity & seismic mitigation, uinta/wasatch/cache national forest / 1240BH27Q0002)?+
Tony Grove Dam Spillway and Seismic Mitigation Construction is a Request for Quote/Qualifications (RFQ) issued by USDA-FS, CSA NORTHWEST 6 for work in Tony Grove, Cache County, UT, USA. The U.S. Department of Agriculture Forest Service is seeking a small-business contractor to reconstruct Tony Grove Dam, including spillway and outlet works, dam crest raising, embankment construction, instrumentation, and related site improvements.
Is Tony Grove Dam Spillway and Seismic Mitigation Construction (gaoa tony grove dam spillway capacity & seismic mitigation, uinta/wasatch/cache national forest / 1240BH27Q0002) still open?+
Yes. Tony Grove Dam Spillway and Seismic Mitigation Construction is open, and responses are due Tuesday, December 15, 2026.
What type of solicitation is Tony Grove Dam Spillway and Seismic Mitigation Construction (gaoa tony grove dam spillway capacity & seismic mitigation, uinta/wasatch/cache national forest / 1240BH27Q0002)?+
Tony Grove Dam Spillway and Seismic Mitigation Construction is a Request for Quote/Qualifications (RFQ) at the federal government level.
When is Tony Grove Dam Spillway and Seismic Mitigation Construction (gaoa tony grove dam spillway capacity & seismic mitigation, uinta/wasatch/cache national forest / 1240BH27Q0002) due?+
Responses to Tony Grove Dam Spillway and Seismic Mitigation Construction are due Tuesday, December 15, 2026.
When was Tony Grove Dam Spillway and Seismic Mitigation Construction (gaoa tony grove dam spillway capacity & seismic mitigation, uinta/wasatch/cache national forest / 1240BH27Q0002) posted?+
USDA-FS, CSA NORTHWEST 6 posted Tony Grove Dam Spillway and Seismic Mitigation Construction on Thursday, November 5, 2026.
What is the deadline to submit questions about Tony Grove Dam Spillway and Seismic Mitigation Construction (gaoa tony grove dam spillway capacity & seismic mitigation, uinta/wasatch/cache national forest / 1240BH27Q0002)?+
Questions about Tony Grove Dam Spillway and Seismic Mitigation Construction were due Tuesday, October 20, 2026.
Is there a pre-bid meeting for Tony Grove Dam Spillway and Seismic Mitigation Construction (gaoa tony grove dam spillway capacity & seismic mitigation, uinta/wasatch/cache national forest / 1240BH27Q0002), and is it required?+
Yes. The Site Visit for Tony Grove Dam Spillway and Seismic Mitigation Construction was on Thursday, October 15, 2026, and attendance is optional. It took place at Tony Grove Dam, end of Forest Service Road 20273, Tony Grove Day Use Park, Utah.
Is there a site visit for Tony Grove Dam Spillway and Seismic Mitigation Construction (gaoa tony grove dam spillway capacity & seismic mitigation, uinta/wasatch/cache national forest / 1240BH27Q0002)?+
Yes. The Site Visit for Tony Grove Dam Spillway and Seismic Mitigation Construction was on Thursday, October 15, 2026, and attendance is optional. It took place at Tony Grove Dam, end of Forest Service Road 20273, Tony Grove Day Use Park, Utah.
What are the key dates for Tony Grove Dam Spillway and Seismic Mitigation Construction (gaoa tony grove dam spillway capacity & seismic mitigation, uinta/wasatch/cache national forest / 1240BH27Q0002)?+
Key dates for Tony Grove Dam Spillway and Seismic Mitigation Construction: Published Date on Monday, October 5, 2026; Site Visit on Thursday, October 15, 2026; Questions Due Date on Tuesday, October 20, 2026; Offers Due Date on Tuesday, December 15, 2026; Estimated Contract Start on Tuesday, June 1, 2027; Base Work Completion Date on Friday, October 1, 2027; Option Work Completion Date on Monday, November 1, 2027.
What is the estimated budget for Tony Grove Dam Spillway and Seismic Mitigation Construction (gaoa tony grove dam spillway capacity & seismic mitigation, uinta/wasatch/cache national forest / 1240BH27Q0002)?+
The solicitation documents state a budget between $1,000,000 and $5,000,000 for Tony Grove Dam Spillway and Seismic Mitigation Construction.
How long is the contract for Tony Grove Dam Spillway and Seismic Mitigation Construction (gaoa tony grove dam spillway capacity & seismic mitigation, uinta/wasatch/cache national forest / 1240BH27Q0002)?+
The contract for Tony Grove Dam Spillway and Seismic Mitigation Construction has a base period of 4 months and 2 option periods of 5 months each, for up to 1 year 2 months in total.
Does Tony Grove Dam Spillway and Seismic Mitigation Construction (gaoa tony grove dam spillway capacity & seismic mitigation, uinta/wasatch/cache national forest / 1240BH27Q0002) require a bid bond or performance bond?+
Yes. Tony Grove Dam Spillway and Seismic Mitigation Construction requires a bid bond of 0%.
Is insurance required for Tony Grove Dam Spillway and Seismic Mitigation Construction (gaoa tony grove dam spillway capacity & seismic mitigation, uinta/wasatch/cache national forest / 1240BH27Q0002)?+
Yes. Tony Grove Dam Spillway and Seismic Mitigation Construction requires the following insurance coverage: Workers Compensation and Employer's Liability (at least $100,000), General Liability (at least $500,000), Automobile Liability (at least $200,000), Aircraft Public and Passenger Liability (at least $200,000).
Is Tony Grove Dam Spillway and Seismic Mitigation Construction (gaoa tony grove dam spillway capacity & seismic mitigation, uinta/wasatch/cache national forest / 1240BH27Q0002) set aside for small or disadvantaged businesses?+
Yes. Tony Grove Dam Spillway and Seismic Mitigation Construction is set aside for Total Small Business Set-Aside (FAR 19.5) (Small Business).
Does Tony Grove Dam Spillway and Seismic Mitigation Construction (gaoa tony grove dam spillway capacity & seismic mitigation, uinta/wasatch/cache national forest / 1240BH27Q0002) require past performance references?+
Past performance is scored in the evaluation of Tony Grove Dam Spillway and Seismic Mitigation Construction but is not a pass or fail requirement.
Is Tony Grove Dam Spillway and Seismic Mitigation Construction (gaoa tony grove dam spillway capacity & seismic mitigation, uinta/wasatch/cache national forest / 1240BH27Q0002) for goods or services?+
Tony Grove Dam Spillway and Seismic Mitigation Construction is a contract for services.
What NAICS and PSC codes apply to Tony Grove Dam Spillway and Seismic Mitigation Construction (gaoa tony grove dam spillway capacity & seismic mitigation, uinta/wasatch/cache national forest / 1240BH27Q0002)?+
Tony Grove Dam Spillway and Seismic Mitigation Construction is classified under NAICS 237990 (Other Heavy and Civil Engineering Construction) and PSC Y1KA (CONSTRUCTION OF DAMS).
Which national stock numbers (NSNs) does Tony Grove Dam Spillway and Seismic Mitigation Construction (gaoa tony grove dam spillway capacity & seismic mitigation, uinta/wasatch/cache national forest / 1240BH27Q0002) cover?+
Tony Grove Dam Spillway and Seismic Mitigation Construction covers NSNs 7540-01-155-3212, 7540-01-152-8067.
Does the work for Tony Grove Dam Spillway and Seismic Mitigation Construction (gaoa tony grove dam spillway capacity & seismic mitigation, uinta/wasatch/cache national forest / 1240BH27Q0002) have to be done on site?+
Yes. The work for Tony Grove Dam Spillway and Seismic Mitigation Construction is performed on site in Tony Grove, Cache County, UT, USA.
Which agency issued Tony Grove Dam Spillway and Seismic Mitigation Construction (gaoa tony grove dam spillway capacity & seismic mitigation, uinta/wasatch/cache national forest / 1240BH27Q0002)?+
Tony Grove Dam Spillway and Seismic Mitigation Construction was issued by USDA-FS, CSA NORTHWEST 6, part of FOREST SERVICE.
Who is the contact for Tony Grove Dam Spillway and Seismic Mitigation Construction (gaoa tony grove dam spillway capacity & seismic mitigation, uinta/wasatch/cache national forest / 1240BH27Q0002)?+
The contact for Tony Grove Dam Spillway and Seismic Mitigation Construction is Judith Martin, reachable at judith.martin@usda.gov or +12083461875.
How do I submit a response to Tony Grove Dam Spillway and Seismic Mitigation Construction (gaoa tony grove dam spillway capacity & seismic mitigation, uinta/wasatch/cache national forest / 1240BH27Q0002)?+
Responses to Tony Grove Dam Spillway and Seismic Mitigation Construction are submitted by email to PPS.proposals@usda.gov.
What documents are attached to Tony Grove Dam Spillway and Seismic Mitigation Construction (gaoa tony grove dam spillway capacity & seismic mitigation, uinta/wasatch/cache national forest / 1240BH27Q0002)?+
Tony Grove Dam Spillway and Seismic Mitigation Construction has 7 attached documents: C04 Attachment 2 - SOI Tony Grove.xlsx, C04 Attachment 5 - DBA WD UT20260105 Cache Co 051826.pdf, C04 Attachment 1 - Solicitation Tony Grove.pdf, C04 Attachment 3 - Specifications Tony Grove.pdf, C04 Attachment 4 - Drawings Tony Grove.pdf, C05 Amendment 01 Tony Grove.pdf, C05 Amendment 02 Tony Grove.pdf.
Where can I download the documents for Tony Grove Dam Spillway and Seismic Mitigation Construction (gaoa tony grove dam spillway capacity & seismic mitigation, uinta/wasatch/cache national forest / 1240BH27Q0002)?+
The documents for Tony Grove Dam Spillway and Seismic Mitigation Construction can be downloaded from Bidscope.
Where was Tony Grove Dam Spillway and Seismic Mitigation Construction (gaoa tony grove dam spillway capacity & seismic mitigation, uinta/wasatch/cache national forest / 1240BH27Q0002) originally published?+
Tony Grove Dam Spillway and Seismic Mitigation Construction was published on sam.gov at https://sam.gov/opp/dc614806cdda4cf7a65ba7034b459649/view.