Trunk Sewer and Water Main Construction
City of Temple > Purchasing Department
Original Solicitation Links
Bid #54-01-27
]knob creek basin trunk sewer improvements, phase iii
Contact
Submission Instructions
or
Description
The City seeks construction of a new sanitary sewer trunk line, including approximately 4,750 linear feet of 24-inch PVC sewer main, additional sewer mains of various sizes, manholes, siphon boxes and lines, sewer services, connections, testing, and related excavation, bypass pumping, and site restoration. The work also includes water main connections, approximately 200 linear feet of 12-inch water main, valves, fittings, and water main testing. An alternate provides for roadway-bored installation of siphon boxes and lines instead of open-cut installation; additional alternates address pipe materials and sizes. The engineer’s estimated project cost is $8,690,770. The contractor must complete the work within 730 consecutive calendar days after the Notice to Proceed. The bid requires a bid bond of at least 5% of the bid amount; performance and payment bonds of 100% of the contract price are required after award. Prevailing wage rates apply.
Classification Codes
Smart Codes
Specifications
Timeline
Requirements
- Workers’ compensation
- Employer’s liability — $100,000.00
- Comprehensive general liability — $500,000.00
- Automobile and truck liability — $500,000.00
- Owner’s protective liability — $500,000.00
- Umbrella excess liability — $1,000,000.00
- Bid Bond — 5%
- Performance Bond — 100%
- Payment Bond — 100%
- Minimum 3 references
- Client point of contact required for each reference
Documents
'Water and Sewer Line and Related Structures Construction' Opportunities
The North Central Montana Regional Water Authority is seeking bids to construct Segment E6 B, Phases...
Insituform Technologies is seeking subcontractors for WSSC Task 137, a water and sewer line construc...
El Paso Water is seeking bids for first-time water and wastewater infrastructure construction in the...
The City of Saint-Eustache is seeking bids for a network separation project on Rue Monseigneur-Prevo...
Rice Lake Construction Group is identified as the contractor for the Alta Municipal Utilities Water ...
The City of Menominee is seeking bids for construction of the Division A Shore Well Wastewater Treat...
The Government of Canada is seeking construction of five major improvements to the I.R. No. 4 commun...
Adams Lake Indian Band is seeking proposals for construction of five improvements to its community w...
MPE, a division of Englobe, is seeking a contractor to upgrade the Cutbank Rural Pipeline Utility wa...
The Village of Tallula is seeking bids to construct a new water treatment plant, including a well, t...
The City of Portland is soliciting bids for storm and sanitary sewer construction along specified st...
The City of Joliet is seeking bids to install approximately 6,200 feet of water main and 540 feet of...
The City of Caldwell is prequalifying Idaho public works contractors and boring subcontractors for g...
The Village Government is seeking a contractor for the Darby Creek BID project, which involves water...
The City of Elgin, Oregon, is seeking bids for construction of water system improvements, with elect...
The Town of Grand Coteau is seeking bids to construct a 500-GPM water treatment plant and associated...
The City of Moville, Iowa, is seeking construction services for water system improvements involving ...
Hillsborough County is seeking qualified contractors for on-call construction and installation of wa...
The Clay County Utility Authority is announcing an upcoming construction solicitation for upgrades t...
Granite Construction Company is seeking subcontractor quotes for construction work on the San Miguel...
The Henry County Water Authority is seeking qualified construction firms for indefinite-quantity wat...
The City of Bismarck is seeking bids for stormwater improvements, including drainage structures, sto...
The Albuquerque Bernalillo County Water Utility Authority is seeking bids for the Paakweree connecti...
The Rivanna Water & Sewer Authority is seeking sealed bids to construct a raw water pump station, re...
Aptus Engineering Ltd. is seeking bids for RDRA Central Area Services, a construction project involv...
Opportunities Near Austin, Texas
The Local Government Purchasing Cooperative is seeking proposals for carpet and tile flooring, stage...
The Texas Department of Transportation is seeking bids for preventive maintenance construction on SL...
Hays Consolidated Independent School District is seeking a cloud-based volunteer management system f...
Round Rock Independent School District is seeking 10 GbE data transport service, scalable to 100 GbE...
The City of Austin is seeking professional state and federal legislative lobbying services.
The Central Texas Regional Mobility Authority is seeking bids for an approximately $920,000 construc...
Round Rock Independent School District is seeking 10 GbE Ethernet transport, scalable to 100 GbE, ac...
The General Services Administration is seeking expressions of interest from property owners or autho...
The Texas Department of Transportation is seeking bids for a bridge replacement on SH 123 in Hays Co...
Hays County is seeking a vendor to rent, deliver, clean, maintain, and remove portable toilets and h...
Integral Care is seeking a SaaS solution for incident management, audit management, and risk assessm...
Round Rock Independent School District is seeking 10 Gb Ethernet or lit-fiber transport service, sca...
The University of Texas System Supply Chain Alliance is seeking preferred suppliers to provide manag...
Hays Consolidated Independent School District is seeking proposals for district-wide WAN transportat...
Hays County is seeking bids for annual contracts to supply cold-mix road-building materials for coun...
The Texas Education Agency is seeking qualified law firms or attorneys to provide as-needed legal co...
The Texas Workforce Commission is seeking bids for full-service single-stream recycling collection a...
The Texas Department of Transportation is seeking bids for heating modifications at its 973 Operatio...
International School of Texas filed an informational request for 1–5 Gbps of data transmission and i...
Hays Consolidated Independent School District is seeking proposals for HVAC, fire alarm, and roofing...
The Texas Comptroller of Public Accounts is seeking SurveyMonkey Enterprise licenses for 34 users, w...
The U.S. Naval Air Systems Command is seeking capability statements from businesses able to manufact...
Hays Consolidated Independent School District is seeking proposals for leased dark fiber or fully ma...
The City of Austin is seeking a cloud-based SaaS CRM solution for its Austin 3-1-1 engagement center...
The Texas Comptroller of Public Accounts, on behalf of the State Employee Charitable Campaign State ...
New Opportunities
The Calcasieu Parish Police Jury is seeking on-call geotechnical engineering and testing services fo...
Buffalo Public Schools is seeking contractors to replace exterior aluminum wall panels and install n...
EPB is seeking proposals for one Hixson Branch renovation project to be completed in accordance with...
Northside Independent School District is seeking bids for maintenance supplies, equipment, rentals, ...
The City of Jacksonville is seeking a one-year renewal of its SecurLore Overwatch agreement for JSO.
Arlington Independent School District is seeking fresh bread for full-service delivery to its school...
The Los Angeles County Department of Beaches and Harbors is seeking qualified consultants for as-nee...
Kino Learning Center, Inc., doing business as Kino School, is seeking 25 Cat6 data drops with testin...
Tioga County is seeking sealed bids to install a new overhead door at the mechanical equipment room ...
Tan Tock Seng Hospital, through ALPS Pte Ltd, is seeking a three-year non-comprehensive maintenance ...
The Central Office for Recovery, Reconstruction and Resiliency is requesting proposals to repair the...
The Michigan Department of Natural Resources is seeking a vendor to provide mobile food concession s...
Corporation d'urgences-santé is seeking safety shoes and boots under a 12-month contract, with propo...
The City of Shelton is seeking structural fire helmets, eye protection, leather front shields, and r...
Miami University is seeking bids for Phase 1 construction of an indoor golf training facility, inclu...
Hewlett-Woodmere Union Free School District is seeking proposals for new wireless access points with...
The City of Little Rock is seeking statements of qualifications from firms for architectural design ...
The City of Miami Beach is establishing a five-year prequalification pool of certified elevator cont...
The Government of Saskatchewan is seeking qualified respondents to supply, maintain, launder, repair...
The City of Miami Beach is seeking applications from contractors to join a five-year pre-qualified p...
The City of Springfield, Missouri, is seeking proposals for approximately $200,000 in competitive CD...
The Rural Resort Area Tax District is seeking proposals from qualified firms or individuals to provi...
Cadillac Asphalt is seeking a contractor for a road construction project involving Consear Road, Syl...
The City of Blue Ash is seeking a qualified engineering firm to study a proposed roundabout at the K...
Virginia Housing Development Authority is seeking proposals for a contract to provide janitorial and...
What is Trunk Sewer and Water Main Construction (knob creek basin trunk sewer improvements, phase iii / Bid #54-01-27)?+
Trunk Sewer and Water Main Construction is an Invitation for/to Bid (IFB/ITB) issued by Purchasing Department for work in Temple, TX, USA. The City of Temple is seeking a contractor to construct a new sewer trunk line, including sewer and water main work, with an estimated project cost of $8,690,770 and a 730-day completion period.
Is Trunk Sewer and Water Main Construction (knob creek basin trunk sewer improvements, phase iii / Bid #54-01-27) still open?+
Yes. Trunk Sewer and Water Main Construction is open, and responses are due Tuesday, January 12, 2027 at 2:00 PM CST.
What type of solicitation is Trunk Sewer and Water Main Construction (knob creek basin trunk sewer improvements, phase iii / Bid #54-01-27)?+
Trunk Sewer and Water Main Construction is an Invitation for/to Bid (IFB/ITB) at the local government level.
When is Trunk Sewer and Water Main Construction (knob creek basin trunk sewer improvements, phase iii / Bid #54-01-27) due?+
Responses to Trunk Sewer and Water Main Construction are due Tuesday, January 12, 2027 at 2:00 PM CST.
When was Trunk Sewer and Water Main Construction (knob creek basin trunk sewer improvements, phase iii / Bid #54-01-27) posted?+
Purchasing Department posted Trunk Sewer and Water Main Construction on Tuesday, November 24, 2026.
What is the deadline to submit questions about Trunk Sewer and Water Main Construction (knob creek basin trunk sewer improvements, phase iii / Bid #54-01-27)?+
Questions about Trunk Sewer and Water Main Construction are due Tuesday, January 5, 2027 at 12:00 PM CST.
What are the key dates for Trunk Sewer and Water Main Construction (knob creek basin trunk sewer improvements, phase iii / Bid #54-01-27)?+
Key dates for Trunk Sewer and Water Main Construction: Bid Documents Released on Tuesday, November 24, 2026 at 2:00 PM CST; Non-Mandatory Virtual Pre-Bid Conference on Thursday, December 10, 2026 at 2:00 PM CST; Expected Contract Award on Friday, January 1, 2027; Questions Due on Tuesday, January 5, 2027 at 12:00 PM CST; Bids Due on Tuesday, January 12, 2027 at 2:00 PM CST; Virtual Bid Opening on Tuesday, January 12, 2027 at 2:00 PM CST.
What is the estimated budget for Trunk Sewer and Water Main Construction (knob creek basin trunk sewer improvements, phase iii / Bid #54-01-27)?+
The solicitation documents state a budget of $8,690,770 for Trunk Sewer and Water Main Construction.
How long is the contract for Trunk Sewer and Water Main Construction (knob creek basin trunk sewer improvements, phase iii / Bid #54-01-27)?+
The contract for Trunk Sewer and Water Main Construction runs for 2 years.
Does Trunk Sewer and Water Main Construction (knob creek basin trunk sewer improvements, phase iii / Bid #54-01-27) require a bid bond or performance bond?+
Yes. Trunk Sewer and Water Main Construction requires a bid bond of 5%, a performance bond of 100% and a payment bond of 100%.
Is insurance required for Trunk Sewer and Water Main Construction (knob creek basin trunk sewer improvements, phase iii / Bid #54-01-27)?+
Yes. Trunk Sewer and Water Main Construction requires the following insurance coverage: Workers’ compensation, Employer’s liability (at least $100,000), Comprehensive general liability (at least $500,000), Automobile and truck liability (at least $500,000), Owner’s protective liability (at least $500,000), Umbrella excess liability (at least $1,000,000).
Does Trunk Sewer and Water Main Construction (knob creek basin trunk sewer improvements, phase iii / Bid #54-01-27) require prevailing wages?+
Yes. Workers on Trunk Sewer and Water Main Construction must be paid prevailing wages. The solicitation states: "The Contractor shall pay all laborers, workmen and mechanics of all skills employed at the site to perform work, not less than the City of Temple adopted rates of wage for work of a similar character. The wage rates shall comply with the attached wage rate list."
Does Trunk Sewer and Water Main Construction (knob creek basin trunk sewer improvements, phase iii / Bid #54-01-27) require past performance references?+
Trunk Sewer and Water Main Construction asks for past performance information, but it is not scored.
Is Trunk Sewer and Water Main Construction (knob creek basin trunk sewer improvements, phase iii / Bid #54-01-27) for goods or services?+
Trunk Sewer and Water Main Construction covers both goods and services.
What NAICS and PSC codes apply to Trunk Sewer and Water Main Construction (knob creek basin trunk sewer improvements, phase iii / Bid #54-01-27)?+
Bidscope matched Trunk Sewer and Water Main Construction to NAICS 237110 (Water and Sewer Line and Related Structures Construction) and PSC Y1ND (CONSTRUCTION OF SEWAGE AND WASTE FACILITIES); the buyer did not publish a code.
Which agency issued Trunk Sewer and Water Main Construction (knob creek basin trunk sewer improvements, phase iii / Bid #54-01-27)?+
Trunk Sewer and Water Main Construction was issued by Purchasing Department, part of City of Temple.
Where is the work for Trunk Sewer and Water Main Construction (knob creek basin trunk sewer improvements, phase iii / Bid #54-01-27) located?+
The work for Trunk Sewer and Water Main Construction is located in Temple, TX, USA.
Who is the contact for Trunk Sewer and Water Main Construction (knob creek basin trunk sewer improvements, phase iii / Bid #54-01-27)?+
The contact for Trunk Sewer and Water Main Construction is Purchasing Department, reachable at purchasing@templetx.gov or +16158492629.
How do I submit a response to Trunk Sewer and Water Main Construction (knob creek basin trunk sewer improvements, phase iii / Bid #54-01-27)?+
Responses to Trunk Sewer and Water Main Construction are submitted online through templetx.bonfirehub.com or by mail to Purchasing Department, City of Temple, 3210 E Avenue H, Building C, Temple, Texas 76501.
What documents are attached to Trunk Sewer and Water Main Construction (knob creek basin trunk sewer improvements, phase iii / Bid #54-01-27)?+
Trunk Sewer and Water Main Construction has 6 attached documents: 06 Bond Requirement Affadavit, Required.pdf, 05 Bid Bond, Required.pdf, 03 Bidder Information Form, Required.pdf, 04 Pricing Sheet with Bid Alternate 1 - Knob Creek Trunk Sewer Improvements, Phase III.xlsx, 07 Conflict of Interest Questionnaire, if applicable.pdf, 01 ITB - Knob Creek Trunk Sewer Improvements, Phase III.pdf.
Where can I download the documents for Trunk Sewer and Water Main Construction (knob creek basin trunk sewer improvements, phase iii / Bid #54-01-27)?+
The documents for Trunk Sewer and Water Main Construction can be downloaded from Bidscope.
Where was Trunk Sewer and Water Main Construction (knob creek basin trunk sewer improvements, phase iii / Bid #54-01-27) originally published?+
Trunk Sewer and Water Main Construction was published on templetx.bonfirehub.com at https://templetx.bonfirehub.com/opportunities/264171.