Pike County Sidewalk Construction
Pettis County
Submission Instructions
Description
The project involves constructing approximately 1,700 linear feet of new five-foot sidewalk with paved approaches along North Main Cross Street, from Main Street (Highway C) to Bowling Green Elementary School (School Street), as part of the Safe Routes to School Program. The prime contractor must be on MoDOT’s Qualified Contractor List and have a responsive questionnaire on file with the Missouri Highways and Transportation Commission at least seven days before bid opening. Bidders must provide E-Verify enrollment documentation. A bid security of 5% is required, and second-tier subcontracting is prohibited. The project has a 0% DBE participation goal.
Classification Codes
Smart Codes
Specifications
Timeline
Requirements
- Bid Bond — 5%
Documents
| Title |
|---|
| 58607.pdf |
'Highway, Street, and Bridge Construction' Opportunities
The Texas Department of Transportation is seeking bids to add passing lanes on US 83 in Runnels Coun...
The Texas Department of Transportation is seeking bids to construct a two-way left-turn lane on FM 2...
The Texas Department of Transportation is seeking bids to construct pedestrian infrastructure along ...
Kemper County is seeking sealed bids for construction services associated with the Kipling Road proj...
The City of Portland is seeking a contractor for the Headworks Road 10 Rehabilitation Project, invol...
The Idaho Transportation Department is seeking sealed proposals for full-depth reconstruction of a r...
The City of Niagara Falls is seeking bids for the reconstruction of McLeod Road under a 13-month con...
St. Tammany Parish Government is seeking sealed bids for the Cross Gates Subdivision highway, street...
Park Construction Co. is seeking bids for reconstruction work on County State Aid Highways 33 and 13...
Oil & Gas Development Company Limited is seeking a contractor to construct 1.5 kilometers of local r...
The Town of Clover is seeking sealed bids for the Bark River Road Improvement Project 2027 in Clover...
Cadillac Asphalt is seeking bids for a road construction project on Fenton Rd, Grand Blanc Rd, I-75,...
Cadillac Asphalt is seeking a subcontractor for road construction on M-153 Frains Lake Rd to Napier ...
The City of Elk River is seeking a contractor for CR 33 improvements from Highway 169 to County Stat...
Loudoun County is seeking a general contractor to widen approximately 3.5 miles of U.S. Route 15 fro...
Herkimer County is seeking bids to rehabilitate Kingdom Road (County Route 155) across the towns of ...
San Bernardino County Public Works is seeking a contractor for the Muscoy Area Rehabilitation Phase ...
Herkimer County is seeking sealed bids to rehabilitate North Gage Road (County Road 65) in the Town ...
St. Martin Parish Government is seeking unit-price bids for roadway improvements under its 2026 Road...
The Texas Department of Transportation is seeking bids for rehabilitation of approximately 33 miles ...
The Village of Merrillan is requesting sealed bids for improvements to a street segment from North H...
The City of Pointe-Claire is seeking bids for daytime pavement rehabilitation on Boulevard Saint-Jea...
The City of Pointe-Claire is seeking bids to reconstruct five avenues, with daytime work and an esti...
The City of Calgary is seeking prequalified prime contractors for a five-year master agreement cover...
Collier County is seeking sealed bids for construction of shoulder improvements on Immokalee Road (C...
Opportunities Near St. Charles County, Missouri
Wentzville R-IV School District is seeking contractors for districtwide inspection, testing, mainten...
St. Charles County Government is seeking a managed services provider for its Microsoft Configuration...
The City of O'Fallon is seeking rental of various-sized straight and articulating lifts for its annu...
The City of O'Fallon, Missouri, is seeking proposals for well maintenance contract services.
The City of O'Fallon is seeking sealed bids for repairs to Guthrie Road Bridge 310021.
The City of O'Fallon is seeking installation of SmartFill fuel management systems and SmartDip tank ...
The City of O'Fallon, Missouri, is seeking sealed bids from authorized Mimecast resellers for specif...
The City of O'Fallon, Missouri, is seeking sealed bids for lift rentals for its Celebration of Light...
The City of O'Fallon is seeking bids for repairs to the Guthrie Road Bridge, including the labor, ma...
The City of O'Fallon is seeking sealed bids for repairs to Guthrie Road Bridge 3210021, with bids du...
Franklin County, Missouri, is seeking a vendor to develop and implement a custom application for tra...
Franklin County, Missouri, is seeking an attorney or law firm to provide prosecution services for ci...
Wentzville R-IV School District is seeking a turnkey inclusive playground designed, furnished, and i...
The St. Louis County Children's Service Fund is seeking a Salesforce implementation partner to asses...
The St. Louis County Children's Service Fund is seeking a Salesforce implementation partner to build...
St. Louis County is seeking bids for trench drain repair under IFB 2026-259126-TC, due November 24, ...
Ritenour School District is seeking a provider for dedicated WAN connectivity and related equipment,...
The Housing Authority of St. Louis County is soliciting proposals under CH-RFP-26-P-04, but the prov...
Parkway School District intends to award Automatic Controls a $93,249 sole-source contract for start...
St. Charles County is seeking proposals to restore the Lindenwood Historic Building, with attendance...
The City of Wentzville is seeking bids for the purchase and delivery of sodium hydroxide.
The City of Wentzville is seeking bids for sign materials, with responses submitted electronically t...
The City of Wentzville is seeking bids for sign materials, with responses submitted electronically t...
The City of Wentzville is seeking proposals to soft-wash the exteriors of three elevated water tanks...
The City of Wentzville is seeking proposals for occupational health and post-offer employment testin...
New Opportunities
Mine Hill Township is seeking a licensed professional engineering firm to provide township and Plann...
Napa County is seeking unarmed security guards to provide routine and emergency patrol, incident res...
Fort Bend County is seeking a contractor to reconstruct Harlem Road, including roadway, drainage, wa...
The City of Encinitas is seeking qualified consultants for as-needed stormwater, hydrology, hydrauli...
The City of Bentonville is requesting qualifications from licensed professional engineering firms to...
The Defense Logistics Agency Energy is seeking contractors for comprehensive fuels operations and ma...
The City of Miami Beach is seeking applications from contractors to join a five-year pre-qualified p...
The City of Phoenix Aviation Department is seeking five years of maintenance, repair, replacement, a...
The Minnesota Department of Administration is seeking weekday janitorial services, including labor, ...
The Philadelphia Parking Authority is seeking a contractor to inspect, maintain, test, repair, and p...
QatarEnergy is seeking a contractor for NGL-3 triethylene glycol and flue gas sampling modification ...
Reclamation District 2091 is providing notice of exemption for the FSRP Critical Erosion Repairs pro...
Chemung County is seeking bids for ready-mix concrete for 2027–2028, with electronic or hard-copy su...
The Los Angeles County Sanitation Districts is seeking a contractor to rehabilitate trunk sewer pipe...
The City of Providence, Kentucky, is seeking a contractor to rehabilitate and upgrade its wastewater...
The Village of Briarcliff Manor is seeking sealed bids to replace approximately 109 feet of water ma...
The Village of Lake Hallie, Wisconsin is seeking sealed bids for the reconstruction and paving of 12...
The City of Elizabeth City is seeking bids to replace the metal roof at Ocean Lakes High School in V...
Orange County, Florida, is seeking sealed electronic bids for the Tibet Butler Trail renovation, wit...
The New York State Department of Transportation is seeking bids for bridge repairs at various locati...
Sulphur Independent School District 1 is seeking proposals for 1–5 Gbps broadband internet access an...
Middle Smithfield Township is seeking bids to construct an approximately 960-foot low-pressure sewer...
The University of Sunderland is seeking written market-engagement responses from providers of occupa...
The Northeast Ohio Regional Sewer District is seeking as-needed, time-and-materials roof repair serv...
Santé Québec – CHU de Québec–Université Laval is seeking prices for seven microdebriders, with three...
What is Pike County Sidewalk Construction (NE District, Pike County, Safe Routes to School Program - Construction of approximately 1,700 linear feet of new 5-foot sidewalk with paved approaches)?+
Pike County Sidewalk Construction is an Invitation for/to Bid (IFB/ITB) issued by Pettis County for work in North Main Cross Street, Frankford, MO, USA. Pike County is seeking bids to construct approximately 1,700 linear feet of new five-foot sidewalk with paved approaches in Frankford, Missouri.
Is Pike County Sidewalk Construction (NE District, Pike County, Safe Routes to School Program - Construction of approximately 1,700 linear feet of new 5-foot sidewalk with paved approaches) still open?+
Yes. Pike County Sidewalk Construction is open, and responses are due Thursday, December 3, 2026.
What type of solicitation is Pike County Sidewalk Construction (NE District, Pike County, Safe Routes to School Program - Construction of approximately 1,700 linear feet of new 5-foot sidewalk with paved approaches)?+
Pike County Sidewalk Construction is an Invitation for/to Bid (IFB/ITB) at the local government level.
When is Pike County Sidewalk Construction (NE District, Pike County, Safe Routes to School Program - Construction of approximately 1,700 linear feet of new 5-foot sidewalk with paved approaches) due?+
Responses to Pike County Sidewalk Construction are due Thursday, December 3, 2026.
When was Pike County Sidewalk Construction (NE District, Pike County, Safe Routes to School Program - Construction of approximately 1,700 linear feet of new 5-foot sidewalk with paved approaches) posted?+
Pettis County posted Pike County Sidewalk Construction on Wednesday, November 4, 2026.
Does Pike County Sidewalk Construction (NE District, Pike County, Safe Routes to School Program - Construction of approximately 1,700 linear feet of new 5-foot sidewalk with paved approaches) require a bid bond or performance bond?+
Yes. Pike County Sidewalk Construction requires a bid bond of 5%.
Can a reseller or distributor bid on Pike County Sidewalk Construction (NE District, Pike County, Safe Routes to School Program - Construction of approximately 1,700 linear feet of new 5-foot sidewalk with paved approaches)?+
No. Pike County Sidewalk Construction requires the bidder to make the product or perform the work itself.
Is Pike County Sidewalk Construction (NE District, Pike County, Safe Routes to School Program - Construction of approximately 1,700 linear feet of new 5-foot sidewalk with paved approaches) for goods or services?+
Pike County Sidewalk Construction is a contract for services.
What NAICS and PSC codes apply to Pike County Sidewalk Construction (NE District, Pike County, Safe Routes to School Program - Construction of approximately 1,700 linear feet of new 5-foot sidewalk with paved approaches)?+
Bidscope matched Pike County Sidewalk Construction to NAICS 237310 (Highway, Street, and Bridge Construction) and PSC Y1LZ (CONSTRUCTION OF PARKING FACILITIES); the buyer did not publish a code.
Which agency issued Pike County Sidewalk Construction (NE District, Pike County, Safe Routes to School Program - Construction of approximately 1,700 linear feet of new 5-foot sidewalk with paved approaches)?+
Pike County Sidewalk Construction was issued by Pettis County.
Where is the work for Pike County Sidewalk Construction (NE District, Pike County, Safe Routes to School Program - Construction of approximately 1,700 linear feet of new 5-foot sidewalk with paved approaches) located?+
The work for Pike County Sidewalk Construction is located in North Main Cross Street, Frankford, MO, USA.
How do I submit a response to Pike County Sidewalk Construction (NE District, Pike County, Safe Routes to School Program - Construction of approximately 1,700 linear feet of new 5-foot sidewalk with paved approaches)?+
Responses to Pike County Sidewalk Construction are submitted by mail to Office of County Commission, Pike County Courthouse, 115 W. Main Street, Bowling Green, MO 63334.
What documents are attached to Pike County Sidewalk Construction (NE District, Pike County, Safe Routes to School Program - Construction of approximately 1,700 linear feet of new 5-foot sidewalk with paved approaches)?+
Pike County Sidewalk Construction has 1 attached document: 58607.pdf.
Where can I download the documents for Pike County Sidewalk Construction (NE District, Pike County, Safe Routes to School Program - Construction of approximately 1,700 linear feet of new 5-foot sidewalk with paved approaches)?+
The documents for Pike County Sidewalk Construction can be downloaded from Bidscope.
Where was Pike County Sidewalk Construction (NE District, Pike County, Safe Routes to School Program - Construction of approximately 1,700 linear feet of new 5-foot sidewalk with paved approaches) originally published?+
Pike County Sidewalk Construction was published on modot.org at https://www.modot.org/projects-be-let-others.