Orange Belt Trail Phase 1 Construction
Pasco County > Board of County Commissioners > Purchasing and Central Mail Services
Original Solicitation Links
Submission Instructions
Description
Pasco County is soliciting bids to construct an approximately 3.08-mile, 12-foot-wide shared-use trail along the south side of Trinity Boulevard, from the existing sidewalk at Little Road to the existing trail at Cool Springs Parkway. The work includes asphalt trail segments and multiple precast concrete boardwalk sections with foundations and railings, as well as concrete walls and abutments, drainage improvements, utility coordination, traffic control, pavement markings, signage, and site restoration. The plans identify approximately 2,457 linear feet of boardwalk and require the specified PermaTrak system for the precast components. The contractor must meet project-specific construction and environmental permit requirements, coordinate with utility owners, and provide construction documentation and testing. The bid package requires a bid security equal to at least 5% of the bid amount; performance and payment bonds and insurance are required from the apparent successful bidder after notice of intent to award, not with the initial bid.
Classification Codes
Smart Codes
Specifications
Timeline
Requirements
- Workers' Compensation
- Employer's Liability — $100,000.00
- Commercial General Liability — $5,000,000.00
- Business Automobile Liability — $1,000,000.00
- Bid Bond — 5%
- Minimum 3 references
- Within the last 3 years
- Client point of contact required for each reference
Location
Documents
'Highway, Street, and Bridge Construction' Opportunities
The Texas Department of Transportation is seeking bids to add passing lanes on US 83 in Runnels Coun...
The Texas Department of Transportation is seeking bids to construct a two-way left-turn lane on FM 2...
The Texas Department of Transportation is seeking bids to construct pedestrian infrastructure along ...
Kemper County is seeking sealed bids for construction services associated with the Kipling Road proj...
The City of Portland is seeking a contractor for the Headworks Road 10 Rehabilitation Project, invol...
The Idaho Transportation Department is seeking sealed proposals for full-depth reconstruction of a r...
The City of Niagara Falls is seeking bids for the reconstruction of McLeod Road under a 13-month con...
St. Tammany Parish Government is seeking sealed bids for the Cross Gates Subdivision highway, street...
Park Construction Co. is seeking bids for reconstruction work on County State Aid Highways 33 and 13...
Oil & Gas Development Company Limited is seeking a contractor to construct 1.5 kilometers of local r...
The Town of Clover is seeking sealed bids for the Bark River Road Improvement Project 2027 in Clover...
Cadillac Asphalt is seeking bids for a road construction project on Fenton Rd, Grand Blanc Rd, I-75,...
Cadillac Asphalt is seeking a subcontractor for road construction on M-153 Frains Lake Rd to Napier ...
The City of Elk River is seeking a contractor for CR 33 improvements from Highway 169 to County Stat...
Loudoun County is seeking a general contractor to widen approximately 3.5 miles of U.S. Route 15 fro...
Herkimer County is seeking bids to rehabilitate Kingdom Road (County Route 155) across the towns of ...
San Bernardino County Public Works is seeking a contractor for the Muscoy Area Rehabilitation Phase ...
Herkimer County is seeking sealed bids to rehabilitate North Gage Road (County Road 65) in the Town ...
St. Martin Parish Government is seeking unit-price bids for roadway improvements under its 2026 Road...
The Texas Department of Transportation is seeking bids for rehabilitation of approximately 33 miles ...
The Village of Merrillan is requesting sealed bids for improvements to a street segment from North H...
The City of Pointe-Claire is seeking bids for daytime pavement rehabilitation on Boulevard Saint-Jea...
The City of Pointe-Claire is seeking bids to reconstruct five avenues, with daytime work and an esti...
The City of Calgary is seeking prequalified prime contractors for a five-year master agreement cover...
Collier County is seeking sealed bids for construction of shoulder improvements on Immokalee Road (C...
Opportunities Near Tampa, Florida
The City of Tampa is seeking a consultant to prepare its HUD Consolidated Plan, with proposals due D...
The City of Tampa is requesting four 4-inch and four 6-inch epoxy-coated mechanical plug valves for ...
Hillsborough County is seeking competitive bids for a term contract covering miscellaneous facilitie...
Hillsborough County Public Schools is seeking contractors to provide modular buildings and related s...
The City of Tampa intends to single-source Peterbilt and PACCAR parts, diagnostics, maintenance, war...
Hillsborough County is seeking contractors for an as-needed, countywide wastewater manhole rehabilit...
The City of Tampa is soliciting sealed bids from certified small local and women/minority business e...
Hillsborough County is seeking qualified contractors for on-call construction and installation of wa...
The City of Tampa is seeking sidewalk grinding services to remove pedestrian trip hazards, document ...
The City of Tampa is seeking a certified Small Local Business Enterprise to identify, characterize, ...
Hillsborough County is seeking a venue, catering, equipment, and related services for a 200-person P...
The City of Tampa is seeking 3,500 blue terry cloth dish towels, packaged 12 per unit, for use by va...
The City of Tampa is seeking an authorized Emerson Discrete Automation distributor or dealer to prov...
Hillsborough County Public Schools is seeking contractors to maintain, repair, and upgrade HVAC wate...
The City of Tampa is seeking bids for galvanized steel and aluminum sign posts in specified sizes an...
The City of Tampa is seeking construction services to repair its wastewater collection system, inclu...
The City of Tampa is seeking a contractor for citywide parks and recreation concrete work, including...
Hillsborough County is seeking competitive sealed bids to rehabilitate Columbus Drive Bridge #105504...
Hillsborough Transit Authority is announcing upcoming proposals for a midlife overhaul of Gillig low...
Hillsborough County is seeking engineering consultants for pavement and sidewalk asset management, e...
The City of Tampa is seeking bids for specified Iluminarc bridge lighting fixtures, lenses, cables, ...
Hillsborough County Public Schools is seeking qualified firms to provide supplemental APRN, RN, and ...
Hillsborough County is seeking bids for branded, sustainable recycling and waste-reduction promotion...
Hillsborough County Public Schools is seeking architectural/engineering and construction management ...
Hillsborough County is seeking proposals for construction management, engineering, and inspection se...
New Opportunities
San Bernardino County Public Works is seeking bids for construction of a sidewalk on Randall Avenue.
The City of Regina is seeking a supplier to provide grass seed under a five-year contract.
The City of Cocoa Beach is seeking bids to build vinyl sheet-pile seawalls with reinforced concrete ...
The City of Arlington is seeking an as-needed supplier to provide and deliver specified fill, soil, ...
The Stillwater Utilities Authority is seeking bids to supply and deliver specified steel transmissio...
Chemung-Schuyler-Steuben Workforce New York is requesting proposals from qualified organizations to ...
Tarrant County is seeking marketing services for County departments, including campaign strategy, me...
The City of Santa Monica is seeking a contractor to print and mail its spring and fall Seascape news...
The City of Cañon City is seeking a contractor to provide janitorial services, labor, equipment, cle...
Cook County is seeking inspection, load testing, certification, and reporting services for fall prot...
Summit Academy is seeking firewall support licenses, network switches, and Cat 6 cabling installatio...
Silverton Independent School District is seeking five Meraki or equivalent wireless access points wi...
The New York State Department of Environmental Conservation is seeking naval architecture consulting...
The Massachusetts Division of Marine Fisheries is seeking commercial fishers for an on-demand gear g...
The Beaufort-Jasper Water & Sewer Authority is seeking an engineering consultant to prepare a Prelim...
The State University of New York at Plattsburgh is seeking sealed bids to improve the plaza at Clint...
Kerrville Independent School District is seeking proposals for fully managed, symmetrical WAN data t...
The City of Sunrise is seeking temporary staffing services for administrative and non-administrative...
The South Carolina Rural Water Association intends to award a sole-source contract for two WaterStep...
St. Isidore Elementary School is seeking proposals for 37 Wi-Fi 7 wireless access points compatible ...
Kosciusko County is seeking sealed bids to replace approximately 77,500 square feet of roofing at it...
The City of Akron is seeking a contractor to reconstruct ADA-compliant curb ramps and refuge medians...
Plumas County Public Works is seeking bids for propane fuel deliveries to four maintenance facilitie...
The City of Dodge Center is seeking bids for wastewater treatment facility improvements, including t...
The Board of Regents of the University System of Georgia, on behalf of the Georgia Institute of Tech...
What is Orange Belt Trail Phase 1 Construction (orange belt trail phase 1 (little road to cool springs parkway) / IFB-KM-27-032)?+
Orange Belt Trail Phase 1 Construction is an Invitation for/to Bid (IFB/ITB) issued by Purchasing and Central Mail Services for work in Trinity, FL, USA. Pasco County is seeking a contractor to construct a 12-foot-wide shared-use trail along Trinity Boulevard, including precast boardwalk sections, pavement, drainage, and related improvements.
Is Orange Belt Trail Phase 1 Construction (orange belt trail phase 1 (little road to cool springs parkway) / IFB-KM-27-032) still open?+
Yes. Orange Belt Trail Phase 1 Construction is open, and responses are due Tuesday, January 5, 2027.
What type of solicitation is Orange Belt Trail Phase 1 Construction (orange belt trail phase 1 (little road to cool springs parkway) / IFB-KM-27-032)?+
Orange Belt Trail Phase 1 Construction is an Invitation for/to Bid (IFB/ITB) at the local government level.
When is Orange Belt Trail Phase 1 Construction (orange belt trail phase 1 (little road to cool springs parkway) / IFB-KM-27-032) due?+
Responses to Orange Belt Trail Phase 1 Construction are due Tuesday, January 5, 2027.
When was Orange Belt Trail Phase 1 Construction (orange belt trail phase 1 (little road to cool springs parkway) / IFB-KM-27-032) posted?+
Purchasing and Central Mail Services posted Orange Belt Trail Phase 1 Construction on Friday, November 20, 2026.
What is the deadline to submit questions about Orange Belt Trail Phase 1 Construction (orange belt trail phase 1 (little road to cool springs parkway) / IFB-KM-27-032)?+
Questions about Orange Belt Trail Phase 1 Construction are due Tuesday, December 22, 2026.
What are the key dates for Orange Belt Trail Phase 1 Construction (orange belt trail phase 1 (little road to cool springs parkway) / IFB-KM-27-032)?+
Key dates for Orange Belt Trail Phase 1 Construction: Solicitation Release on Friday, November 20, 2026; Deadline for Written Questions on Tuesday, December 22, 2026; Responses to Questions Posted on Tuesday, December 29, 2026; Bid Submission Deadline on Tuesday, January 5, 2027; Public Bid Opening on Tuesday, January 5, 2027.
Does Orange Belt Trail Phase 1 Construction (orange belt trail phase 1 (little road to cool springs parkway) / IFB-KM-27-032) require a bid bond or performance bond?+
Yes. Orange Belt Trail Phase 1 Construction requires a bid bond of 5%.
Is insurance required for Orange Belt Trail Phase 1 Construction (orange belt trail phase 1 (little road to cool springs parkway) / IFB-KM-27-032)?+
Yes. Orange Belt Trail Phase 1 Construction requires the following insurance coverage: Workers' Compensation, Employer's Liability (at least $100,000), Commercial General Liability (at least $5,000,000), Business Automobile Liability (at least $1,000,000).
Does Orange Belt Trail Phase 1 Construction (orange belt trail phase 1 (little road to cool springs parkway) / IFB-KM-27-032) have a local preference?+
Yes. Orange Belt Trail Phase 1 Construction gives preference to local bidders.
Does Orange Belt Trail Phase 1 Construction (orange belt trail phase 1 (little road to cool springs parkway) / IFB-KM-27-032) require past performance references?+
Yes. Orange Belt Trail Phase 1 Construction requires 3 past performance references from the past 3 years.
Can a reseller or distributor bid on Orange Belt Trail Phase 1 Construction (orange belt trail phase 1 (little road to cool springs parkway) / IFB-KM-27-032)?+
No. Orange Belt Trail Phase 1 Construction requires the bidder to make the product or perform the work itself.
Is Orange Belt Trail Phase 1 Construction (orange belt trail phase 1 (little road to cool springs parkway) / IFB-KM-27-032) for goods or services?+
Orange Belt Trail Phase 1 Construction covers both goods and services.
What NAICS and PSC codes apply to Orange Belt Trail Phase 1 Construction (orange belt trail phase 1 (little road to cool springs parkway) / IFB-KM-27-032)?+
Bidscope matched Orange Belt Trail Phase 1 Construction to NAICS 237310 (Highway, Street, and Bridge Construction) and PSC Y1PA (CONSTRUCTION OF RECREATION FACILITIES (NON-BUILDING)); the buyer did not publish a code.
Which agency issued Orange Belt Trail Phase 1 Construction (orange belt trail phase 1 (little road to cool springs parkway) / IFB-KM-27-032)?+
Orange Belt Trail Phase 1 Construction was issued by Purchasing and Central Mail Services, part of Board of County Commissioners.
Where is the work for Orange Belt Trail Phase 1 Construction (orange belt trail phase 1 (little road to cool springs parkway) / IFB-KM-27-032) located?+
The work for Orange Belt Trail Phase 1 Construction is located in Trinity, FL, USA.
How do I submit a response to Orange Belt Trail Phase 1 Construction (orange belt trail phase 1 (little road to cool springs parkway) / IFB-KM-27-032)?+
Responses to Orange Belt Trail Phase 1 Construction are submitted online through pascocountyfl.bonfirehub.com.
What documents are attached to Orange Belt Trail Phase 1 Construction (orange belt trail phase 1 (little road to cool springs parkway) / IFB-KM-27-032)?+
Orange Belt Trail Phase 1 Construction has 16 attached documents: B. INSTRUCTIONS TO BIDDERS.pdf, E6.1. Clearance Timings.pdf, C. GENERAL CONDITIONS.pdf, E7. FDOT AGREEMENT.pdf, D. SPECIAL CONDITIONS.pdf, E1. Civil Technical Specifications.pdf, E3. ERP Intent to Approve.pdf, E4. Utility Coordination.pdf, and 8 more.
Where can I download the documents for Orange Belt Trail Phase 1 Construction (orange belt trail phase 1 (little road to cool springs parkway) / IFB-KM-27-032)?+
The documents for Orange Belt Trail Phase 1 Construction can be downloaded from Bidscope.
Where was Orange Belt Trail Phase 1 Construction (orange belt trail phase 1 (little road to cool springs parkway) / IFB-KM-27-032) originally published?+
Orange Belt Trail Phase 1 Construction was published on pascocountyfl.bonfirehub.com at https://pascocountyfl.bonfirehub.com/opportunities/263986.