F-16 Radar Electron Tube Repair Qualification

The Department of the Air Force is seeking to qualify a source to repair electron tubes for the F-16 AN/APG-68 radar dual mode transmitter.

General
Open (active)
F16_AN_APG68_ElectronTube_5960011538780_PN_585R224H01_3
Aug 12, 2027 04:00 AM
Aug 12, 2025 11:28 AM
Request for Proposal (RFP)
Federal
Ask AI about this solicitation
Original Solicitation Links
[

F16_AN_APG68_ElectronTube_5960011538780_PN_585R224H01_3

]

f16_an_apg68_electrontube_5960011538780_pn_585r224h01_3

Contact
Tracey Beringer
tracey.beringer@us.af.mil
Description

The Department of the Air Force is seeking to qualify a source to repair electron tubes with NSN 5960-01-153-8780 and P/N 585R224H01 and 585R224H03 for the F-16 AN/APG-68 radar dual mode transmitter. To become a qualified source, offerors must notify the appropriate government Small Business Office or the contracting officer of their intent to qualify. Offerors must certify that they have the required facilities and equipment to repair, inspect, test, package, and store the item and make their facilities available for government evaluation and inspection. Offerors must verify that they have a complete data package, including Northrop Grumman drawing 585R224, and repair the item to conform to government requirements. The offeror must submit a qualification test plan/procedure detailing how they intend to verify compliance with all requirements identified by Drawing 585R224H01,H03 and provide a pre-contract award qualification article for evaluation. The estimated costs for testing and evaluation are $4,500, and the estimated time for completion of qualification is 180 days.

Classification Codes
NAICS811210Electronic and Precision Equipment Repair and Maintenance
PSCJ012Maintenance, Repair and Rebuilding of Equipment: Fire Control Equipment
Smart Codes
electron tuberadar transmitterf-16 partselectron tube repairradar repairtransmitter repairavionics repairmilitary electronicsaircraft radaraircraft electronics
Timeline
May 20, 2025-Date of Repair Data List
Aug 12, 2025-Published Date
Aug 12, 2027-Response Date
Aug 27, 2027-Inactive Date
Documents
TitleDate Posted
RDL 585R224H01-3.pdfAug 12, 2025 12:00 PM
Comments
Correspondences
Custom Fields