UPS Replacement at Fort Greely, Alaska
Original Solicitation Links
W911KB25R0032
]ftg247 replace ups at idt1, fort greely, alaska
Contact
Description
The US Army Corps of Engineers is soliciting proposals for the replacement of existing 80KVA Uninterruptable Power Systems (UPSs) with distributed redundant 75 Kilovolt-Ampere (KVA) UPSs at Fort Greely, Alaska. New UPS panelboards will be added to allow for redundant receptacles for all the mission equipment within the High-Altitude Electromagnetic Pulse (HEMP)-shielded equipment room. The Emergency Power Off (EPO) will be upgraded to the latest MDA GMD standards. Also, the Power Control and Monitoring System (PCMS) and Power Quality Monitoring System (PQMS) will be extended into IDT1 from the Fort Greely Power Plant (FPP). The estimated dollar magnitude of this project is anticipated between $1,000,000 and $5,000,000, with a performance period of approximately 540 calendar days.
Smart Codes
Timeline
Documents
| Title | Date Posted |
|---|---|
| B.01.03 Presolicitation notice.pdf | Jan 28, 2025 12:00 PM |