Somerton Blvd Construction Manager at Risk Project

The town of Gilbert, Arizona is seeking Statements of Qualifications from Construction Manager at Risk firms for the Somerton Blvd project.

General
Open
ST2130
May 29, 3025 08:00 PM
May 01, 2025 12:00 PM
Request for Qualifications (RFQ)
Local
Ask AI about this solicitation
Contact
Jason Snider
jason.snider@giblertaz.gov
Description

The town of Gilbert, Arizona is seeking Statements of Qualifications (SOQs) from qualified Construction Manager at Risk (CM@R) firms for the design and construction of Somerton Blvd from Williams Field to Verde Drive. Additional improvements include the installation of a 12" water line, 8" sewer line connections from Verde Drive and Williams Field Road, storm water pipe/catch basins/retention, and irrigation pipe. A pre-submittal conference will be held on May 1st, 2025. SOQs are due by May 29th, 2025.

Smart Codes
road constructionsewer line connectionswater line installationstorm water pipeirrigation pipeconstruction managerroad designcatch basinsretention basinswater infrastructure
Timeline
May 1, 2025-Pre-Submittal Conference
May 29, 2025-SOQ Due Date
Comments
Correspondences
Custom Fields